Program
Time |
Event |
|
19:30 - 22:00
|
Get together Party |
|
Wednesday, August 21, 2019
Time |
Event |
|
09:00 - 09:30
|
Registration and opening (Amphithéâtre Gaston Planté) |
|
09:30 - 10:30
|
Sustainability (Amphithéâtre Gaston Planté) - Chairman: Stéphane Dauzère-Pérès |
|
09:30 - 10:00 |
› A Min-Max Approach for the Robust Two-level Lot Sizing Problem with Multiple Components and Remanufacturing - Kerem Akartunali, University of Strathlyde |
|
10:00 - 10:30 |
› A bi-level single-item lot-sizing problem for industrial symbiosis - Elodie SUZANNE, Ecole des Mines de Saint Etienne |
|
10:30 - 11:00
|
Coffee break (Salon d'honneur) |
|
11:00 - 12:30
|
Integrated decisions – I (Amphithéâtre Gaston Planté) - Chairman: Kerem Akartunali |
|
11:00 - 11:30 |
› Modeling and solving an integrated lot-sizing and bin-packing problem with sequence-dependent setups - Silvio Alexandre de Araujo, Departamento de Matemática Aplicada, IBILCE, UNESP - Univ. Estadual Paulista |
|
11:30 - 12:00 |
› A Branch-and-Cut Algorithm for an Assembly Routing Problem - Raf Jans, HEC Montréal |
|
12:00 - 12:30 |
› Integrated lot-sizing and maintenance planning - Wilco van den Heuvel, Erasmus University Rotterdam |
|
12:30 - 14:00
|
Lunch (CNAM Restaurant) |
|
14:00 - 15:00
|
Perishable items (Amphithéâtre Gaston Planté) - Chairman: Florian Sahling |
|
14:00 - 14:30 |
› Lot Sizing for a Perishable Item - Hande Yaman, Faculty of Economics and Business, KU Leuven |
|
14:30 - 15:00 |
› A new inventory issuing rule based on the expected remaining lifespan for a randomly perishable product - Mehdi Karimi-Nasab, University of Hamburg |
|
15:00 - 15:30
|
Coffee break (Salon d'honneur) |
|
15:30 - 18:00
|
Visit to the Arts et Metiers museum - Visit to the Arts et Metiers museum |
|
Thursday, August 22, 2019
Time |
Event |
|
09:00 - 10:30
|
Integrated decisions – II (Amphithéâtre Gaston Planté) - Chairman: Christian Almeder |
|
09:00 - 09:30 |
› Buyback contract terms integrated with batch ordering decisions - Ayse Akbalik, Université de Lorraine |
|
09:30 - 10:00 |
› A Branch-and-Cut Algorithm for the Production-Routing Problem with Coordinated and Capacitated Lot-Sizes and Backorders - Tiffany Bayley, Lazaridis School of Business and Economics, Wilfrid Laurier University |
|
10:00 - 10:30 |
› An integrated multi level lot sizing problem with a single railway track transport problem - Asma RAKIZ, Emines-Mohammed VI Polytechnic University |
|
10:30 - 11:00
|
Coffee Break (Salon d'honneur) |
|
11:00 - 12:30
|
Decomposition approaches (Amphithéâtre Gaston Planté) - Chairman: Silvio de Araujo |
|
11:00 - 11:30 |
› Benders Decomposition for a Stochastic Three-level Lot Sizing and Replenishment Problem with a Distribution Structure - Matthieu Gruson, HEC Montréal |
|
11:30 - 12:00 |
› A dynamic programming based decomposition approach for the stochastic uncapacitated single-item lot-sizing problem - Franco Quezada, Laboratoire d'Informatique de Paris 6 (LIP6) |
|
12:00 - 12:30 |
› Parallelized approaches to solve the capacitated lot-sizing problem with lost sales and setup times - Mehdi Charles, Ecole des Mines de Saint-Etienne, Decision Brain |
|
12:30 - 14:00
|
Lunch (CNAM Restaurant) |
|
14:00 - 15:30
|
Stochastic lot sizing (Amphithéâtre Gaston Planté) - Chairman: Raf Jans |
|
14:00 - 14:30 |
› Single-item dynamic lot sizing with stochastic demand timing - Stéphane Dauzère-Pérès, Ecole des Mines de Saint-Etienne |
|
14:30 - 15:00 |
› Multi-stage stochastic capacitated lot sizing with different backlog control mechanisms - Fabian Friese, Leibniz University Hannover |
|
15:00 - 15:30 |
› Optimal (R,s,S) policy for single-item inventory lot sizing problem with stochastic non-stationary demand - Andrea Visentin, Insight Centre for Data Analytics |
|
15:30 - 16:00
|
Coffee break (Salon d'honneur) |
|
16:00 - 17:00
|
Extensions on the demand (Amphithéâtre Gaston Planté) - Chairman: Wilco van den Heuvel |
|
16:00 - 16:30 |
› Capacitated single-item production planning with lost sales - Nadjib Brahimi, Rennes School of Business |
|
16:30 - 17:00 |
› The Profit-Maximizing Lot Size Problem with Pricing Lag Effects - Erik Langelo, Molde University College |
|
17:00 - 18:00
|
Meeting of the EURO Working Group on Lot-Sizing (Amphithéâtre Gaston Planté) |
|
20:45 - 23:15
|
Gala dinner - The Flavours dinner cruise |
|
Time |
Event |
|
09:30 - 10:30
|
Energy (Amphithéâtre Gaston Planté) - Chairman: Nabil Absi |
|
09:30 - 10:00 |
› Renewable versus grid energy for a mid term production and capacity adjustment planning - Christophe Rapine, Université de Lorraine |
|
10:00 - 10:30 |
› Energy storage management with energy curtailing incentives in a telecommunications context - Isaias F. Silva, Orange Labs |
|
10:30 - 11:00
|
Coffee break (Salon d'honneur) |
|
11:00 - 12:30
|
Applications (Amphithéâtre Gaston Planté) - Chairman: Safia Kedad-Sidhoum |
|
11:00 - 11:30 |
› A column generation approach for production planning in semiconductor manufacturing - Sébastien Beraudy, Ecole des Mines de Saint Etienne |
|
11:30 - 12:00 |
› Dynamic lot sizing for LNG inventories - Onur Kilic, University of Groningen |
|
12:00 - 12:30 |
› The Multi-Period Cutting Stock Problem with Diameter Conversion in the Construction Industry - Haldun Süral |
|
12:30 - 14:00
|
Lunch (CNAM Restaurant) |
|
|